Santa Clarita · ADU Rules, Costs & Timeline 2026

Building an ADU in Santa Clarita. Rules, costs, timeline.

What SCMC § 17.57.040 actually allows now that Ordinance 26-2 hands size, height, setbacks and parking to state law, and what it actually costs to build one on a Santa Clarita Valley lot in 2026.

What you can build — at a glance

Reviewed by CALI ADU’s ADU specialists · September 2026

Max ADU size
No local cap since Ord. 26-2 (April 28, 2026) — state floors govern: a city may not cap below 850 sqft (studio/1 BR) or 1,000 sqft (2+ BR), and an 800 sqft unit may never be refused (Gov. Code § 66321(b)(2)–(3))
Detached height
No local cap since Ord. 26-2 — Gov. Code § 66321(b)(4) governs: 16 ft base; 18 ft + 2 ft to match the primary’s roof pitch within ½ mile of transit; 18 ft (no roof-pitch bonus) on a lot with a multistory multifamily dwelling
Attached height
No local cap — Gov. Code § 66321(b)(4)(D) governs: 25 ft or the height limit the zone applies to the primary dwelling, whichever is lower · 2 stories
Side & rear setbacks
4 ft — no local ADU setback since Ord. 26-2; the Gov. Code § 66321(b)(3) 4-ft guarantee applies directly, and conversions take no setback (§ 66323(a))
Units per SFR lot
Up to 3: conversion ADU + JADU + new detached ≤800 sqft (Gov. Code § 66323; HCD Handbook). Ord. 26-2 removed the former 1 ADU + 1 JADU cap; the state stack applies directly.
Parking required
No local parking standard since Ord. 26-2 — Gov. Code § 66322 governs (one space maximum, with its statutory exemptions); no replacement parking may be required for a converted garage or carport (§ 66314(d)(11)), and parking may never be required for a JADU (§ 66334(a))
Permit timeline
60 days · ministerial review, no hearing (Gov. Code § 66317)
High Fire Hazard Severity Zone
No ADU-specific fire-zone standard in SCMC § 17.57.040 since Ord. 26-2 (the former two-access-way rule is gone). On a state-designated Very High Fire Hazard Severity Zone lot only, the California Fire Code and LA County Fire access requirements apply at building permit — as fire-safety standards, not a bar on ADUs; and sprinklers may not be required if the primary dwelling has none (Gov. Code § 66314(d)(12))
  • Detached No local size cap — state floors 850 sqft (0–1 BR) / 1,000 sqft (2+ BR) · 16 ft state base height (1-story default)
  • Attached No local size cap — same state floors · 25 ft / 2-story envelope, or the zone’s primary-dwelling height limit if lower
  • Garage conversion Within existing permitted garage footprint
  • Interior conversion Carved out of existing primary dwelling space
  • Junior ADU Up to 500 sqft inside primary dwelling

Per SCMC § 17.57.040(L), as replaced by Ordinance 26-2 (April 28, 2026) — a state-deferential subsection that sets no local size, height, setback, parking or unit-count standard — and Gov. Code §§ 66310–66342, which therefore govern directly. Cross-checked against the HCD ADU Handbook (2026 Addendum); the City Planning Division’s ADU FAQ is cited only where it restates state law. Full citations in the sections below.

Where these rules come from

Every rule on this page traces to a primary source. We use three:

  • The Santa Clarita Municipal Code. Accessory Dwelling Units are governed by SCMC § 17.57.040(L), within Chapter 17.57 (Property Development Standards — Residential) of the city’s Unified Development Code, as codified by Ordinance 26-2, adopted April 28, 2026 (which replaced the Ordinance 25-1 § 5 text of May 27, 2025). The official text is published by the City through eCode360 at ecode360.com/48597191.
  • California state law. Government Code §§ 66310–66342, renumbered from former § 65852.2 by SB 477 effective March 25, 2024, plus recent amendments (SB 1211, AB 1154, AB 1033, AB 462). State law sets a floor that no city — including Santa Clarita — can drop below.
  • The City of Santa Clarita Planning Division. The Planning Division (23920 Valencia Blvd., Suite 140) publishes an ADU FAQ handout. We rely on it only where it restates state law or covers items outside the ADU subsection, such as oak tree clearance.

When Santa Clarita’s ordinance and California state law disagree, the more-permissive rule controls under Gov. Code § 66316 — and since Ordinance 26-2 the City’s code says so itself: § 17.57.040(L) provides that if any conflict arises between the subsection and California law, California law controls. Three state-law amendments (SB 1211, AB 1154, AB 1033) are material in 2026 and we cover each in the state-law section below.

No third-party ADU-company blog summaries. To verify anything yourself, call the Santa Clarita Planning Division at (661) 255-4330, or contact the California Department of Housing and Community Development (HCD) for state-law questions.

What you can build in Santa Clarita

Since Ordinance 26-2 (April 28, 2026), Santa Clarita’s ADU rules are the California state floor: SCMC § 17.57.040(L) sets no local size, height, setback, parking or unit-count standard and defers to Gov. Code §§ 66310 et seq. outright. Two local layers still matter on the ground: oak tree protection, and the Fire Code access requirements that apply on state-designated fire-hazard lots. No detached-to-primary separation is set in § 17.57.040(L) after Ordinance 26-2 — confirm with Planning whether a general accessory-structure spacing rule elsewhere in Chapter 17.57 applies to your lot.

Number of units allowed

Single-family lots — the state-law § 66323 stack. Ordinance 26-2 removed the former one-ADU-plus-one-JADU cap from SCMC § 17.57.040; the subsection now defers to Gov. Code § 66323 directly. Under the § 66323 stack, an eligible single-family lot can typically combine all three of the following on the same parcel:

  • One conversion ADU — built inside an existing accessory structure or existing primary-dwelling space (Gov. Code § 66323(a)(1)).
  • One Junior ADU (JADU) — up to 500 sqft inside the primary dwelling’s existing walls (Gov. Code § 66333).
  • One new detached Statewide Exemption ADU — up to 800 sqft, 16 ft in height, with 4-ft side and rear setbacks (Gov. Code § 66323(a)(4) & (b)).

That is up to three units per lot, and in Santa Clarita it is now the local rule as well as the state one. If an older City handout still describes a one-ADU-plus-one-JADU allowance, it no longer reflects § 17.57.040(L). The HCD ADU Handbook confirms the stack as the governing rule for any single-family lot. Before you formally submit your application, ask the Santa Clarita Planning Division to confirm in writing that the full three-unit § 66323 stack applies to your lot. Getting that confirmation up front protects the entitlement if questions come up later during plan check.

Multifamily lots. Santa Clarita sets no local multifamily count since Ordinance 26-2. California SB 1211 (effective January 1, 2025) raised the state-law floor to up to eight detached ADUs on a multifamily lot, not to exceed the number of existing primary units, plus a 25% conversion-ADU allowance inside the multifamily structure (Gov. Code § 66323(a)(4)(A)(ii)). With no local cap in § 17.57.040(L), the state figure applies directly.

Size limits

SCMC § 17.57.040(L) sets no local size cap since Ordinance 26-2, so Gov. Code § 66321 governs directly:

  • Detached ADU: the City may not cap a detached ADU below 850 sqft for studios and 1-bedroom units, or 1,000 sqft for units with two or more bedrooms (Gov. Code § 66321(b)(2)). These are the floors the City must allow, not local ceilings.
  • Attached ADU: the same 850/1,000 sqft floors apply. The former local limit of 50% of the primary residence’s floor area went with the rest of the Ord. 25-1 standards.
  • Junior ADU: up to 500 sqft, built entirely inside the primary residence’s existing or proposed walls (including an attached garage). Mirrors Gov. Code § 66313(d).
  • Garage conversion: must be constructed within the existing permitted garage footprint.
  • Statewide Exemption ADU floor: per Gov. Code § 66323, every eligible lot is entitled to at least one ADU of up to 800 sqft, 16 ft in height, with 4-ft side and rear setbacks, regardless of local development standards.
The Laurel Canyon Signature Home — 2 BR / 1 BA, 660 sqft, modern flat-roof exterior — well inside the 1,000 sqft 2-bedroom floor that Gov. Code § 66321 guarantees in Santa Clarita
The Laurel Canyon — 2 BR / 1 BA, 660 sqft. Stays well inside the 1,000 sqft 2-bedroom floor that governs in Santa Clarita (Gov. Code § 66321(b)(2)) and below the 750 sqft impact-fee threshold (Gov. Code § 66311.5(c)(1)).

Setbacks

SCMC § 17.57.040(L) sets no local ADU setback since Ordinance 26-2, so the state guarantees govern directly:

  • Side and rear setbacks: 4 feet — the state-law guarantee in Gov. Code § 66321(b)(3), applied directly.
  • Detached-to-primary separation: none is set in § 17.57.040(L) after Ordinance 26-2. Confirm at pre-submission whether a general accessory-structure spacing rule elsewhere in Chapter 17.57 applies to your lot.
  • Front setback: governed by the underlying base zone’s front-yard setback — which, under Gov. Code § 66321(b)(3), may not be applied so as to prevent an 800 sqft ADU with 4-foot side and rear setbacks.
  • Conversion: no additional setback required when the ADU is built inside the existing permitted garage footprint.

Maximum height

SCMC § 17.57.040(L) sets no local height cap since Ordinance 26-2, so Gov. Code § 66321(b)(4) governs directly:

  • Detached ADU — base: 16 feet — the state base height in Gov. Code § 66321(b)(4)(A), applied directly.
  • Detached ADU — transit exception: within one-half mile walking distance of a major transit stop or high-quality transit corridor, 18 feet plus 2 ft to match the primary dwelling’s roof pitch (effective 20 ft) (Gov. Code § 66321(b)(4)(B)).
  • Detached ADU — multistory-multifamily exception: on a lot with an existing or proposed multistory multifamily dwelling, 18 feet, with no roof-pitch bonus (Gov. Code § 66321(b)(4)(C)).
  • Attached ADU: up to 25 feet or the height limit the zone applies to the primary dwelling, whichever is lower, and 2 stories (Gov. Code § 66321(b)(4)(D)). This floor defers to the zone — confirm the parcel’s zone limit before designing to 25 ft.
  • Garage conversion: within the existing garage footprint, no separate height increase.

What this means for design. Because the City sets no cap of its own, the state 16-ft base is the operative detached envelope on most lots — Santa Clarita is effectively a 1-story detached-ADU market by default, with a 2-story path available for attached ADUs under the 25-foot envelope (or the zone’s primary-dwelling limit, if lower). Our two-story Signature plans stand roughly 25 feet, so they cannot be permitted as detached units in Santa Clarita as drawn; we modify them to fit the envelope, or design a custom ADU. Lots within one-half mile of transit can stretch a detached ADU to 20 ft — useful for a vaulted ceiling but still a 1-story envelope. The product story on most SCV lots is a well-designed 1-story detached unit.

Parking

SCMC § 17.57.040(L) imposes no local parking requirement since Ordinance 26-2 (the former local waiver list is gone), so Gov. Code § 66322 governs directly:

  • Default rule: at most one off-street parking space per ADU (Gov. Code § 66322).
  • Five state-law exemptions (Gov. Code § 66322): no on-site parking required when the ADU meets any of the following:
    • Within one-half mile walking distance of public transit.
    • Contained entirely within the existing primary residence or an existing accessory structure.
    • Located within an architecturally and historically significant historic district.
    • On a lot subject to a residential permit parking program where the ADU occupant is not eligible for a permit.
    • Within one block of a car-share vehicle.
  • Garage conversion: no replacement parking required for the primary dwelling when a garage is demolished or converted in conjunction with ADU construction (Gov. Code § 66314(d)(11)). This rule preempts any local replacement-parking requirement.
  • JADU parking: parking may never be required for a JADU (Gov. Code § 66334(a)). The former local JADU garage-replacement language was deleted by Ordinance 26-2.

Lot coverage and FAR

Per Gov. Code § 66321(b)(3), a city cannot apply local FAR, lot coverage, or open-space standards in a way that prevents construction of at least an 800 sqft ADU with 4-foot side and rear setbacks and 16 feet of height. Santa Clarita’s base residential zones generally accommodate the 850/1,000 sqft state floors on standard SCV single-family lots, which are typically 5,000–9,000 sqft and larger in master-planned subdivisions. The Statewide Exemption ADU under § 66323 is the floor any eligible lot can rely on.

The Fairfax Signature Home — 2 BR / 1.5 BA, 840 sqft, two-story traditional gable exterior — anchors Santa Clarita's attached-ADU two-story path under the 25-foot envelope that Gov. Code § 66321(b)(4)(D) guarantees
The Fairfax — 2 BR / 1.5 BA, 840 sqft, two-story traditional gable. In Santa Clarita, two-story Signature Homes are the attached path under the 25-ft / 2-story envelope in Gov. Code § 66321(b)(4)(D) (or the zone’s primary-dwelling limit, if lower). Detached on most lots stays 1-story under the 16-ft state base height.

Owner-occupancy

For ADUs: not required. Ordinance 26-2 deleted the former SCMC § 17.57.040(L)(2)(n)(i) provision that put an owner-occupancy condition on any ADU applied for on or after January 1, 2025, and Gov. Code § 66315 bars a city from imposing owner-occupancy on an ADU in any event. There is nothing left in the code to be quoted at the counter.

For JADUs: SCMC § 17.57.040(L)(3)(b) requires the property owner to occupy either the single-family residence or the JADU, unless exempt under applicable law, including Gov. Code § 66333(b). That is the AB 1154 exemption (effective January 1, 2026): owner-occupancy applies only when the JADU shares sanitation facilities with the primary residence. A JADU with its own dedicated bathroom is not subject to owner-occupancy, and Santa Clarita’s code now cites the exemption expressly.

Impact fees

  • Under 750 sqft: exempt from development impact fees per Gov. Code § 66311.5(c)(1).
  • 750 sqft and above: impact fees are charged proportionally to the primary dwelling, calculated using the ADU’s square footage per § 66311.5(c)(1).
  • What the local code says: SCMC § 17.57.040(L)(5)(a) states that all ADUs and JADUs are subject to development impact fees, charged proportionally to the primary dwelling’s square footage, “except as provided in applicable law.” The local text omits both state exemption thresholds. Gov. Code § 66311.5(c)(1) governs: no impact fee on an ADU of 750 sqft or less, none on a JADU of 500 sqft or less, and proportional charging only above 750 sqft — and § 17.57.040(L) itself provides that California law controls on any conflict.
  • Utility connections: SCMC § 17.57.040(L)(5)(b) requires a separate utility connection for each ADU and JADU, subject to a connection fee or capacity charge, “except as provided by applicable law.” State ADU law bars requiring a new or separate connection for an ADU created by conversion within an existing single-family dwelling or accessory structure, and requires any connection fee to be proportionate to the unit’s burden on the system; the subsection’s own supremacy clause means the state rule controls.
  • Design implication: a 750-sqft ADU can shave thousands off the fee schedule compared to an 850–1,000 sqft unit. The Sunset Signature Home (480 sqft) and Wilshire Signature Home (400 sqft) both sit well inside the exemption.

Permitting timeline

Per Gov. Code § 66317, an ADU or JADU application that is deemed complete must be approved or denied ministerially within 60 days. No design review hearing, no neighbor notice, no discretionary conditions. Real-world elapsed time from initial submission to permit issuance in Santa Clarita typically runs 3 to 5 months because the 60-day clock starts only after the application is deemed complete, and most projects go through a correction cycle or two before that point. Lots with oak trees or in the High Fire Hazard Severity Zone run longer because of the additional review layers covered below.

How California state law overrides Santa Clarita

California ADU law has been amended almost every year since 2017. Since Ordinance 26-2 (April 28, 2026), Santa Clarita’s ADU subsection defers to that law outright — § 17.57.040(L) says California law controls on any conflict — so the state floors below apply directly rather than by preemption under Gov. Code § 66316. These are the ones that matter for a Santa Clarita project in 2026.

1. The § 66323 stack — up to 3 units on a single-family lot

Ordinance 26-2 removed the former one-ADU-plus-one-JADU cap from SCMC § 17.57.040. Gov. Code § 66323 now governs directly: an eligible single-family lot can typically combine a conversion ADU, a JADU, and a new detached Statewide Exemption ADU (≤800 sqft / 16 ft / 4-ft setbacks) on the same parcel — up to three units. If an older City handout still describes the narrower allowance, it no longer reflects the code. Before you formally submit, ask the assigned City planner to confirm in writing that the three-unit stack applies to your lot — that gets the entitlement on record before plan check starts.

2. SB 1211 (effective January 1, 2025) — multifamily detached ADU count

SB 1211 amended Gov. Code § 66323(a)(4)(A)(ii) to allow up to eight detached ADUs on a multifamily lot, capped at the number of existing primary units, plus a 25% conversion-ADU allowance inside the multifamily structure. Santa Clarita sets no local multifamily cap since Ordinance 26-2, so the state figure applies directly. On the relatively small number of SCV multifamily parcels — mostly clustered along Lyons Avenue and in Newhall — this is a meaningful unlock.

3. AB 1154 (effective January 1, 2026) — JADU owner-occupancy narrowing

SCMC § 17.57.040(L)(3)(b) requires the property owner to occupy either the single-family residence or the JADU unless exempt under applicable law, including Gov. Code § 66333(b). AB 1154 amended § 66333(b) (effective January 1, 2026) so that owner-occupancy applies only when the JADU shares sanitation facilities with the primary residence. JADUs with their own dedicated bathroom and sink — no shared plumbing — are not subject to owner-occupancy, and Santa Clarita’s code cites the exemption expressly.

3b. Gov. Code § 66315 — ADU owner-occupancy is preempted outright

The former SCMC § 17.57.040(L)(2)(n)(i) provision — owner-occupancy for any ADU applied for on or after January 1, 2025 — was deleted by Ordinance 26-2. Gov. Code § 66315 bars a city from imposing owner-occupancy on an ADU, full stop, and Gov. Code § 66316 makes a noncompliant local provision null and void, so the deletion changed nothing about your rights; it simply removed a clause that used to get quoted at intake.

4. AB 1033 (Gov. Code § 66342) — Santa Clarita has NOT opted in

California AB 1033, now codified at Gov. Code § 66342, authorizes cities to permit ADUs to be sold separately from the primary dwelling as condominium units — but only if the city adopts a local opt-in ordinance. Santa Clarita has not. The City Planning Division’s ADU FAQ confirms: an ADU may be rented separately from the primary residence, but may not be sold or otherwise conveyed separately.

Unlike Santa Monica (SMMC § 9.31.026) and Culver City (CCMC § 17.400.096), Santa Clarita ADU owners cannot subdivide and sell the ADU as a condominium. If a condo-sale exit is part of your investment thesis, this is a decision point — either Santa Clarita is the wrong geography for that strategy, or you wait until the City Council adopts an AB 1033 opt-in.

5. Garage conversions — no replacement parking

Gov. Code § 66314(d)(11) prohibits a city from requiring replacement parking when an existing garage, carport, or covered parking structure is demolished or converted in conjunction with ADU construction. Ordinance 26-2 deleted the former local JADU garage-replacement language, so nothing in § 17.57.040(L) asks for it. If replacement parking is nonetheless requested during plan check, this is the section to cite.

Permitting your ADU

Ministerial review, 60-day clock

Per Gov. Code § 66317, Santa Clarita must approve or deny a complete ADU or JADU application ministerially within 60 days of the application being deemed complete. No design review hearing. No Planning Commission action. No neighbor notice. If your plans meet the objective standards in SCMC § 17.57.040, the City must approve.

The 60-day clock is statutory. The real-world elapsed time is longer because most projects go through one or two correction cycles, and because Building Safety plan check (Title 18 of the Municipal Code) runs alongside Planning review. Expect approximately 3 to 5 months from initial submission to permit issuance in Santa Clarita on a straightforward project — longer on lots with oak protection, hillside grading, or High Fire Hazard Severity Zone access review.

Where to submit

Applications go to the City of Santa Clarita Planning Division at 23920 Valencia Blvd., Suite 140 (phone (661) 255-4330). The City also operates an online Permit Portal accessible through santaclarita.gov for application submittal and plan-check tracking.

Pre-submission review we recommend

A pre-submission meeting with the assigned planner confirms code compliance before you enter the fee-paid review queue, catches High Fire Hazard Severity Zone access requirements and oak protection nuances specific to your parcel, and identifies the state-law preemption positions (SB 1211, AB 1154, § 66323 Statewide Exemption) you may need to assert. We do this on every Santa Clarita project and it materially reduces correction cycles.

High fire hazard zones and ADU construction

Santa Clarita is one of the LA County cities most affected by state-designated fire hazard severity zones. Significant portions of the foothills, canyon edges, Newhall Pass slopes, Placerita Canyon, and San Francisquito Canyon areas fall within High Fire Hazard Severity Zones (HFHSZ) or Very High Fire Hazard Severity Zones (VHFHSZ) per CalFire designation. A meaningful share of SCV residential lots sit inside one of these overlays.

Before Ordinance 26-2, SCMC § 17.57.040 carried its own rule for these lots: an ADU had to front a highway or have two non-overlapping access ways. Ordinance 26-2 deleted that provision, and the ADU subsection now contains no fire-zone standard at all. What remains is the generally applicable layer: on a state-designated Very High Fire Hazard Severity Zone lot, the California Fire Code and LA County Fire fire-apparatus access requirements apply at building permit, as they would to any new construction — so that emergency vehicles can reach the property and residents can evacuate during a fast-moving fire event.

Why these rules apply at all. California Fire Code §§ 503 and 903–915, and Public Resources Code §§ 4201–4204, give local jurisdictions authority to impose stricter fire-safety rules in state-designated Very High Fire Hazard Severity Zones. Those rules (fire-apparatus access, defensible space) survive ADU-statute preemption because they trace to fire-code authority, not ADU-statute authority — and they apply as fire-safety standards on a VHFHSZ lot, never as a categorical bar on ADUs. One state limit runs the other way: sprinklers cannot be required for the ADU if the primary dwelling has none (Gov. Code § 66314(d)(12)). The 60-day ministerial approval clock and 4-foot setbacks still apply; fire access is layered on top.

What this means for your project. Verify your parcel’s designation against the CalFire fire hazard severity zone maps (published at fire.ca.gov) and the City’s Safety Element. If the lot is in a state-designated VHFHSZ and only has a single dead-end access road, Fire Code access review may call for frontage improvements or a secondary access easement, or favor a design that places the ADU within an existing structure (conversion ADU) rather than as new detached construction. Pre-submission planning review is essential on these sites.

Oak tree clearance. Separate from the fire-zone rule, properties containing oak trees require clearance from the City’s Urban Forestry Division before any development can occur (City Planning ADU FAQ). Santa Clarita’s heritage oak ordinance protects mature California oaks; the Urban Forestry review evaluates proposed grading, trenching, foundation work, and tree-canopy impact. If mature oaks sit within roughly 50 feet of the proposed ADU footprint, plan for an early site walk with the Urban Forester.

Signature Homes that fit Santa Clarita lots

All three are 1-story designs that sit inside the state-law detached envelope Santa Clarita now applies directly — 16 ft base height (Gov. Code § 66321(b)(4)) and the 850/1,000 sqft 0–1BR and 2+BR floors. Fixed-price plans (design and permit included); est. cost to build shown for an independent licensed GC. Designed to permit through the Santa Clarita Planning Division.

What an ADU costs in Santa Clarita (2026)

Our architect-designed Signature Home plans are a single fixed price — design and permit included, no change orders. Plan fees run from $7,490 to $12,990. Est. cost to build runs $180K–$420K across the lineup. Most of our Signature plans fit as a 1-story detached unit inside the 850/1,000 sqft floors that state law guarantees in Santa Clarita. The Lincoln (3 BR / 2 BA, 1,000 sqft, est. $325K–$350K to build) sits right at the 1,000 sqft 2+BR floor.

Building on a typical Santa Clarita lot in 2026 adds three line items beyond the construction estimate:

  • Site work — foundation, trenching, and grading on hillside parcels.
  • Utility connections — water, sewer, and electric service drop (SCV Water and City Public Works review apply).
  • City fees and impact fees — ADUs under 750 sqft are exempt from impact fees per Gov. Code § 66311.5(c)(1).

The 750 sqft impact-fee threshold is the easiest way to shave several thousand dollars off the fee schedule.

The Lincoln Signature Home ADU — 3 BR / 2 BA, 1,000 sqft, Spanish flat-roof exterior — sits at the 1,000 sqft 2+BR floor that Gov. Code § 66321 guarantees in Santa Clarita, and suits the city's master-planned Mediterranean architectural character
The Lincoln — 3 BR / 2 BA, 1,000 sqft. Plans $12,990 fixed; est. $325K–$350K to build with an independent licensed GC. Lands exactly at the 1,000 sqft 2+BR floor state law guarantees in Santa Clarita (Gov. Code § 66321(b)(2)), and the Spanish flat-roof exterior reads well against the master-planned Mediterranean character of Valencia, Saugus, and Stevenson Ranch adjacent neighborhoods.

Lots in the High Fire Hazard Severity Zone carry extra line items. These include fire-apparatus access work (if a secondary access way is needed), fire-rated assemblies, sprinklers where the primary dwelling triggers them, and Class A roof assemblies. We price each item on your site during the Backyard Review so your build estimate reflects the parcel you own. Once your plans are permitted, build it yourself, bring your own licensed contractor, or build with one of our vetted construction partners.

Renting your new ADU

Per SCMC § 17.57.040(L)(3)(a), any rental of a Santa Clarita ADU must be for a term of 30 days or longer (the JADU rule at (L)(3)(b) is the same) — the 30-day floor matches state law under Gov. Code § 66314(e). Practically, that means a Santa Clarita ADU is a long-term tenancy asset: monthly leases or longer, not nightly Airbnb or weekly vacation rentals.

A few drivers anchor SCV rental demand. Six Flags Magic Mountain and Henry Mayo Newhall Hospital both employ locally in Valencia. CalArts pulls in a steady student and faculty rental base. Princess Cruises runs its corporate office population from Santa Clarita. SCV rents track the broader north-county market. A well-finished 1- or 2-bedroom ADU in Valencia, Saugus, Newhall, or Canyon Country usually leases within 60 to 90 days of completion. A rough payback on the est. cost to build is 10 to 14 years at 2026 SCV rents. The exact number turns on which Signature Home you build and the lot you build it on.

Why Santa Clarita is a strong ADU market

Santa Clarita is one of the few large LA County cities where the typical lot is big enough to fit a 1,000 sqft detached ADU without crowding the primary house or the rear yard. Master-planned blocks in Valencia, Saugus, and north Newhall mostly run 6,000 to 9,000+ sqft. The city’s suburban setback culture lines up well with the 4-foot side and rear setbacks.

The rules also work in your favor. Since Ordinance 26-2, Santa Clarita’s ordinance simply adopts the state-law floor. There is no citywide historic overlay like Pasadena, no Coastal Zone, and no citywide rent control. Two SCV-specific layers do need attention: Fire Code access on state-designated fire-hazard lots, and the heritage oak ordinance. Both are well defined and solvable with early Planning Division engagement on the parcels they touch.

ADU questions, answered

The questions Santa Clarita homeowners actually ask before they start — with citations to SCMC § 17.57.040, the City Planning Division’s ADU FAQ, and Gov. Code §§ 66310–66342.

How large an ADU can I build in Santa Clarita?

Santa Clarita no longer sets a local ADU size cap. Ordinance 26-2 (April 28, 2026) replaced SCMC § 17.57.040(L) with a short subsection that defers to state law, so the Gov. Code § 66321 floors govern directly: the City may not cap an ADU below 850 sqft for studios and 1-bedroom units or 1,000 sqft for units with two or more bedrooms, and an 800 sqft unit can never be refused on size grounds. The former 50%-of-primary limit on attached ADUs went with the rest of the local standards. JADUs are capped at 500 sqft by state law and must be built entirely inside the primary dwelling’s walls.

Can I build a two-story detached ADU in Santa Clarita?

Not as a free-standing detached unit on most lots. Since Ordinance 26-2, SCMC § 17.57.040(L) sets no local height cap, so the Gov. Code § 66321(b)(4) floors are the operative rule: a detached ADU is guaranteed 16 feet, rising to 18 ft plus 2 ft to match the primary’s roof pitch within one-half mile of transit, or to 18 ft (no roof-pitch bonus) on a lot with a multistory multifamily dwelling. That is a 1-story envelope on most lots, so our two-story Signature plans, which stand roughly 25 feet, cannot be permitted as detached units in Santa Clarita as drawn — we modify them to fit, or design custom. The 2-story path is an attached ADU: Gov. Code § 66321(b)(4)(D) guarantees 25 ft or the zone’s primary-dwelling height limit, whichever is lower, and 2 stories. Confirm your parcel’s zone limit with Planning before designing to 25 ft.

Do I need on-site parking for a Santa Clarita ADU?

Usually not. Since Ordinance 26-2, SCMC § 17.57.040(L) imposes no local parking requirement, so Gov. Code § 66322 governs directly: at most one space, and none at all under its five exemptions — within one-half mile of public transit, contained inside the existing primary or accessory structure, in a historic district, on a permit-only parking street where the ADU occupant is not offered a permit, or within one block of a car-share vehicle. Garage conversions never trigger replacement parking for the primary dwelling per Gov. Code § 66314(d)(11), and parking may never be required for a JADU (§ 66334(a)).

Does Santa Clarita require owner-occupancy for ADUs?

No. Ordinance 26-2 deleted the former SCMC § 17.57.040(L)(2)(n) provision that put an owner-occupancy condition on ADUs applied for on or after January 1, 2025, and Gov. Code § 66315 bars a city from imposing owner-occupancy on an ADU in any event. For JADUs, SCMC § 17.57.040(L)(3)(b) requires the owner to occupy either the single-family residence or the JADU unless exempt under applicable law, including Gov. Code § 66333(b). That is the AB 1154 exemption, effective January 1, 2026: owner-occupancy applies only when the JADU shares sanitation facilities with the primary residence. A JADU with its own dedicated bathroom is not subject to owner-occupancy, and Santa Clarita’s code now cites the exemption expressly.

What if my lot is in the High Fire Hazard Severity Zone?

Ordinance 26-2 removed the former SCMC § 17.57.040 rule that an ADU on a High Fire Hazard Severity Zone lot had to front a highway or have two non-overlapping access ways; the ADU subsection now carries no fire-zone standard. On a state-designated Very High Fire Hazard Severity Zone lot, the California Fire Code and LA County Fire access requirements still apply at building permit — as fire-safety standards under fire-code authority (California Fire Code §§ 503 and 903–915), not as a bar on ADUs — and sprinklers cannot be required for the ADU if the primary dwelling has none (Gov. Code § 66314(d)(12)). Verify your parcel’s designation against CalFire fire hazard severity zone maps (fire.ca.gov) and the City’s Safety Element. Hillside, canyon, and foothill neighborhoods are most likely affected.

Can I rent my Santa Clarita ADU on Airbnb?

No nightly or weekly stays. Per SCMC § 17.57.040(L)(3)(a), any rental of a Santa Clarita ADU must be for a term of 30 days or longer (the JADU rule at (L)(3)(b) is the same) — the 30-day floor matches state law under Gov. Code § 66314(e). Santa Clarita ADUs are long-term tenancy assets, leased monthly or longer.

Can a Santa Clarita ADU be sold separately from the main house?

No. Per the City Planning Division’s ADU FAQ, an ADU in Santa Clarita may not be sold or otherwise conveyed separately from the primary residence. AB 1033 (Gov. Code § 66342) allows cities to opt in to ADU condominium sales, but Santa Clarita has not adopted an opt-in ordinance. Santa Monica (SMMC § 9.31.026) and Culver City (CCMC § 17.400.096) have opted in; Santa Clarita has not. Monitor City Council ordinance action if a condo-sale exit matters to your project math.

Are there oak tree rules I need to know about?

Yes. Per the City Planning Division’s ADU FAQ, properties containing oak trees require clearance from the City’s Urban Forestry Division before any development can occur. Santa Clarita’s heritage oak ordinance protects mature California oaks; Urban Forestry review checks proposed grading, trenching, foundation work, and tree-canopy impact. Plan for an early site walk if mature oaks sit within roughly 50 feet of the proposed ADU footprint.

Transparent pricing in writing Permit-ready fixed-price plans SCV fire-zone & oak protocols

Ready to build your ADU
in Santa Clarita?

We’ll check your lot, walk you through the options, and give you a transparent estimate — before you commit to anything. 15 minutes.

15 minutes · No obligation

The CALI ADU permit guarantee

Approved, or every dollar of your plan fee back.

California ADU review is ministerial: a plan that meets state and local standards must be approved. Our plans are engineered to those standards, which is why we can put money behind the outcome.

Money-back permit guarantee
Once our feasibility study says we can permit your ADU, if your city refuses to issue the permit, you get every dollar of your plan fee back.
Unlimited corrections, one fixed fee
If your city comes back with plan-check corrections, we handle every round of revisions and resubmittals at no added fee until the plan is approved.
14-day submission on Signature plans
Choose a Signature Home with no design changes and your plan set is completed and submitted to the city within 14 days. City review itself typically takes 6–8 weeks.

126 Los Angeles ADU projects taken through permitting. Zero denied.