Skip to main content
Pasadena farmhouse garage conversion — exterior front
Garage Conversion

3-Car Garage Turned Farmhouse ADU in Pasadena

1 Bed, 1 Bath · 600 sqft · North Lake, Pasadena, CA

A homeowner creating long-term housing for their adult son with special needs

The Challenge: Reclaim an Oversized Garage and Create Independent Living Space for a Family Member

The client had an old, oversized 3-car detached garage sitting unused in the backyard—mostly filled with things they no longer needed. Instead of letting it continue to sit idle, they saw an opportunity: create a permanent home for their adult son with special needs, giving him independence while keeping him close.

They didn’t want anything flashy or overly modern. Their vision was simple: a warm, functional space with a classic farmhouse feel that would feel familiar, safe, and comfortable.

The Design: A One-Bedroom ADU with a Farmhouse Vibe

The extra space inside the 3-car garage gave us enough room to design a true one-bedroom ADU, not just a studio. We used a traditional layout that prioritized ease of movement, comfort, and privacy.

  • Vertical siding and exposed roof rafter tails for that timeless farmhouse look
  • A separate bedroom, full kitchen, and private living space
  • Simple, durable finishes that feel homey without being high-maintenance
  • Wide pathways and an open layout to keep the space accessible long-term

We kept the building footprint and roofline intact to streamline the permit process, while upgrading everything inside and out to meet current ADU code.

The Result: A Private, Comfortable Home—Just Steps Away from Family

The completed ADU now serves as a fully independent home for the clients’ son—giving him the freedom to live on his own, while staying just a short walk from the main house.

It feels like a cottage, not a converted garage. The exterior blends into the yard with classic charm, and the inside offers all the essentials: a real bedroom, full-size appliances, lots of light, and space to live and grow comfortably.

This project shows how a little-used structure can be turned into something that truly improves a family's quality of life.

Floor Plan

Pasadena farmhouse garage conversion floor plan — 600 sqft, 1 bed 1 bath
15 minutes · No obligation

Want something like this for your backyard?

Most clients find their fit in our Signature Home plan lineup. A few each year commission a fully custom design like the one above. Either way, start with a 15-minute Backyard Review — we'll place a Signature Home on your actual property to scale, walk you through the interior in 3D, and quote your plans before you commit to anything.

Our Signature Home plans — fixed-price design + permit, from $7,490 · est. cost to build $180K–$420K · or fully custom from $9,990

Two Ways to Build

Signature Home or fully custom.
Both start with a fixed price.

Everything we learned across 126 projects went into two paths. Our architect-designed Signature Homes — single-story and two-story — are ready to permit at a fixed design fee from $7,490. Or we design fully custom for your lot, your program, your constraints, from $9,990. Same fixed fee, same no-change-orders promise, est. cost to build $180K–$420K either way.

Signature plans from $7,490 · custom design from $9,990 · est. cost to build $180K–$420K · transparent every time.

The CALI ADU permit guarantee

Approved, or every dollar of your plan fee back.

California ADU review is ministerial: a plan that meets state and local standards must be approved. Our plans are engineered to those standards, which is why we can put money behind the outcome.

Money-back permit guarantee
Once our feasibility study says we can permit your ADU, if your city refuses to issue the permit, you get every dollar of your plan fee back.
Unlimited corrections, one fixed fee
If your city comes back with plan-check corrections, we handle every round of revisions and resubmittals at no added fee until the plan is approved.
14-day submission on Signature plans
Choose a Signature Home with no design changes and your plan set is completed and submitted to the city within 14 days. City review itself typically takes 6–8 weeks.

126 Los Angeles ADU projects taken through permitting. Zero denied.