Skip to main content
Stacked Duplex Plans — detached 2 units ADU building on a California multifamily lot
One unit above the other

Stacked Duplex Plans

The same two units stacked rather than spread — roughly half the ground footprint, which is the entire point on a narrow or shallow lot.

2Units
Two storiesStories
18–20 ftHeight needed
0Parking required
Duplex — two units

Half the footprint of side-by-side, on a lot that cannot spare the width.

A stacked duplex trades height for land. Where a side-by-side asks for 32 feet of width and roughly 830 square feet of ground, this one puts one unit above the other on a 32-by-13-foot footprint — about half the land for nearly the same living area, and your rear yard back. The two units have identical layouts: a one-bedroom of 361 square feet with its own kitchen, full bath, in-unit laundry and private exterior entrance. The catch is the height allowance. Two stories generally needs 18 feet, and 18 feet is conditional — you get it if your existing multifamily building is multistory, or if the property is within a half-mile walking distance of a major transit stop or high-quality transit corridor. If neither applies, you are held to 16 feet and this plan is not available to you.

Configuration
2 × 1BR / 1BA
Size
361 sqft per unit · 722 sqft total
Footprint
32' × 12'-11"
Height allowance needed
18–20 ft

Who this is for. Owners on narrow or shallow lots who qualify for 18 feet — either because the existing building is two or more stories, or because the property sits near qualifying transit.

Floor plan

361 sqft per unit · 722 sqft total

Floor plan of the CALI ADU stacked duplex ADU — a 361 square foot one-bedroom unit with living, dining, kitchen, bath and in-unit laundry. The first and second floor units have identical layouts.
Each unit is a complete home — its own entrance, kitchen, full bath and in-unit laundry. Unit sizing is set deliberately against the 750 sqft impact-fee threshold, which on a multi-unit project applies per unit.
Inside a unit

Each side is a complete home.

Living and dining area inside a CALI ADU stacked duplex unit
Living / dining
Kitchen with full-size range and dishwasher inside a CALI ADU stacked duplex unit
Kitchen
Bedroom inside a CALI ADU stacked duplex unit
Bedroom
Full bathroom inside a CALI ADU stacked duplex unit
Bathroom
Why this plan

What makes it work.

Half the footprint, same living area

A 32-by-13-foot footprint — roughly 415 square feet of ground for 722 square feet of living area. The side-by-side needs about twice the land for a comparable result.

Both units well under the fee line

At 361 square feet each, both units sit far below the 750 sqft interior-livable-space threshold where impact fees begin — and on a multi-unit project that exemption applies per ADU.

Still a two-unit building

Like the side-by-side, it stays in the simpler Group R-3 building-code category. The sprinkler and accessibility step-up attaches at three units, not two.

Identical layouts, private entries

Both floors are the same one-bedroom plan, each with its own kitchen, full bath, in-unit laundry and private exterior entrance. No shared interior circulation, no common corridor.

Pricing

Fixed plan fee, estimated build.

Plans + permit processing $9,490
Estimated construction $295,000–$345,000

Construction estimate by an independent licensed general contractor. Not a CALI ADU price. City plan-check and permit fees are paid directly by you at cost.

What the plan fee includes

  • Floor plans and elevations designed in-house by expert ADU designers
  • Structural engineering and Title 24 energy compliance coordination
  • Your interior and exterior finish selections, specified in the plans
  • Entitlement documentation citing § 66323(a)(4) and the HCD Handbook
  • Done-for-you permit processing and expediting with your city
  • Unlimited plan-check corrections until your permit is issued
  • A builder-ready set any licensed contractor can price and build

Why the build cost varies

Utility capacity

Adding two to four units can exceed the existing electrical service, sewer lateral, or water meter sizing. On multi-unit projects this is routinely the largest unbudgeted line item — and it is knowable early.

Your height allowance

Sixteen, eighteen or twenty feet. It decides whether a stacked configuration is even available to you, and it changes the structure, the stair, and the foundation.

Unit count and occupancy class

A detached two-unit building is generally Group R-3. Three or more is generally Group R-2, which brings sprinklers, accessibility provisions and stricter assemblies. The step from two units to three is larger than one to two.

Site access and existing conditions

Rear-yard access for equipment, grading, existing hardscape and the condition of what is already on the lot. Tenanted properties add sequencing constraints.

Multifamily ADU plans are designed in-house by our ADU design team and carry the same curated finishes as our detached Signature Homes. Your plan fee is fixed. Because multi-unit projects vary more than single ADUs — utility capacity, site access, grading, and the condition of your existing building — the cost to build is an estimate that starts at the figure shown and is confirmed for your specific property; it is not a single guaranteed price. Construction is performed by an independent licensed general contractor.

Before you choose a plan

Confirm what your lot is entitled to.

Every plan on this page depends on two facts about your property: whether your existing building qualifies as a multifamily dwelling under state ADU law, and what height allowance you have. A duplex in an R1 zone qualifies — zoning is not the test, your structure is. And the difference between 16 and 18 feet is the difference between a single-story and a stacked building.

The full rules — unit counts, height tiers, setbacks, impact fees, what a city cannot require and what actually blocks these projects — are laid out on our multifamily ADU guide.

Stacked Duplex FAQ

Questions owners ask.

How do I know if I qualify for 18 feet?

Two independent pathways. Your existing multifamily building is multistory (Gov. Code § 66321(b)(4)(C)), or the property is within a half-mile walking distance of a major transit stop or high-quality transit corridor (§ 66321(b)(4)(B)). Either one gets you to 18 feet. It is the first thing we check on a feasibility assessment, because it changes the answer more than anything else.

Can I get to 20 feet?

Only through the transit pathway. The extra two feet for a roof pitch matching your primary building appears in § 66321(b)(4)(B) — the transit provision — and nowhere else. The multistory provision is a hard 18 feet with no pitch bonus. This distinction is widely misread, including in some city guidance.

Is a two-story ADU allowed if my zoning caps buildings at one story?

Generally yes. If the project fits inside the height allowance, a local agency cannot deny it for being two stories, even where the underlying zoning restricts primary dwellings to one story. HCD made findings against the City of Los Angeles on exactly this point. Height governs, not a story count.

Multifamily ADU

See what your lot supports. Before anything gets drawn.

A written determination of your entitlement, height allowance, buildable envelope, and which configurations actually fit.

Designed in-house · Transparent pricing · Your choice of builder

The CALI ADU permit guarantee

Approved, or every dollar of your plan fee back.

California ADU review is ministerial: a plan that meets state and local standards must be approved. Our plans are engineered to those standards, which is why we can put money behind the outcome.

Money-back permit guarantee
Once our feasibility study says we can permit your ADU, if your city refuses to issue the permit, you get every dollar of your plan fee back.
Unlimited corrections, one fixed fee
If your city comes back with plan-check corrections, we handle every round of revisions and resubmittals at no added fee until the plan is approved.
14-day submission on Signature plans
Choose a Signature Home with no design changes and your plan set is completed and submitted to the city within 14 days. City review itself typically takes 6–8 weeks.

126 Los Angeles ADU projects taken through permitting. Zero denied.